On December 7, 2019, the grand opening of the new three-story STARTIME Talent Center took place!! 8 Pirogovsky Lane / Shevchenko Avenue. Odesa. Originally, this building was supposed to house a restaurant. And when it was 70% ready, our clients bought the building in order to create a new large building for the STARTIME production center in it.
The project of reconstruction of the restaurant into the STARTIME production center is our debut project in the field of show business. We got to work as quickly as possible. The planning was agreed upon in a few days, and the builders began dismantling. Almost everything was reconstructed! Partitions were dismantled, tiles were removed, the installed ventilation was disassembled, the bathrooms were moved. In general – it was spinning, spinning, everything rushed like a top)))
In parallel, the project was created:
Production
Post-production
Television studio
Radio station
Recording studio
Hairdresser
Dressing room
CALL Centre
Vocals
Stage
Choreography
Dance
Conference hall
Various individual rooms, restrooms, kitchens, showers, accounting, security. A total of 40 rooms. Everyone has their own offices and spaces. Try not to forget anyone and “respect” everyone. We faced a number of Engineering difficulties: some we inherited, others appeared during the design process. And again, BIM technologies came to our aid.
We used the existing “restaurant” openings in the ceilings down to the centimeter to lay our new engineering networks in them.
We optimized the design solutions and everything worked out. Green light! Installation started!
STARTIME was growing before our eyes. All the work was done in 4 months.
3 floors. 1000 sq.m. It was incredible! All our interior design ideas were approved without hesitation, for which I thank the boss Oleg Khoroshy